Key specifications at a glance

  • Measurement voltage: 150–1000 V DC
  • Current input: integrated shunt, direct connection; max 650 A (DCM6-650), max 200 A (DCM6-200); line loss calculation in 2-wire or 4-wire mode
  • Accuracy class: Class B (EN 50470-4:2023)
  • MID, Eichrecht (correspondingly labeled versions): MID: type examination certificate T12796 (module B, NMi Certin); Eichrecht: T12796-DE
  • Communication: 2 × RS485 Modbus RTU; signed OCMF 1.2.0 datasets (ECDSA secp256r1); LCD display
  • Measured quantities: bidirectional active energy; V, A, kW, line loss; storage of more than 225,000 charging records

Applications

  • Energy metering installed directly in DC fast charging stations (e-mobility)
  • Charging-session billing that requires certified metering, with signed measurement data, as part of the metering capsule (Messkapsel)
  • Metering the energy delivered at the charge point with line losses taken into account
  • Passing metering and charging data to the charging station controller over RS485 Modbus RTU

Eastron DCM6 DC energy meter models

Both models measure 150–1000 V DC, and both measure current through an integrated shunt with direct connection; they differ in current range and weight.

Eastron DCM6 DC energy meter models
Model Rating Key feature
DCM6-650 150–1000 V DC, Iref 130 A, Imax 650 A high-current version for DC fast chargers; 0.55 kg
DCM6-200 150–1000 V DC, Iref 40 A, Imax 200 A lower-current version with lower starting and minimum current; 0.47 kg

DC energy meter for EV charging: technical specifications

DC energy meter for EV charging: technical specifications
Parameter Value
Measurement voltage 150–1000 V DC
Current input integrated shunt, direct connection; max 650 A (DCM6-650), max 200 A (DCM6-200)
Current characteristics DCM6-650: Ist 0.52 A, Imin 6.5 A, Itr 13 A, Iref 130 A; DCM6-200: Ist 0.08 A, Imin 1 A, Itr 4 A, Iref 40 A
Accuracy class Class B (EN 50470-4:2023)
Minimum measured quantity (MMQ) 0.1 kWh
Energy registers mains energy (+A, −A, total); device energy excluding line loss; line loss energy (positive, negative, total)
Line loss calculation 2-wire or 4-wire mode; line resistance 0–99.99 mΩ, settable in assembly mode only, change is logged (0 = disabled)
Meter constant (LED) 1000 imp/kWh (total mains energy)
Signed data OCMF 1.2.0; signature ECDSA-secp256r1-SHA256; verification with the S.A.F.E. transparency software (1.3.0); the meter public key and Server ID must be displayed visibly on the outside of each charge point
Time-based tariffing not supported; the timestamp is provided by the charging station controller
Data storage more than 225,000 start and stop charge records; more than 3000 logbook entries
RS485 interfaces COM1: RJ12-1 and terminals 7–8 (charging controller); COM2: RJ12-2 (DCM-D external display); 4800–115,200 bps (default 19,200), 8N1; address 1–247; max 1000 m
Display dot-matrix LCD, 7 + 4 digits, 37.5 × 17 mm; public key can be shown as a QR code; external display: DCM-D (RJ12)
Auxiliary supply, power consumption auxiliary supply 9–40 V DC, <2 W; voltage circuit <0.5 W (at Un); current circuit <0.12 W (at Imax)
Overvoltage protection tested peak impulse voltage 9.6 kV; recommended impulse voltage from the charging station <6 kV
Operating and storage temperature operating −40 to +80 °C; storage −40 to +85 °C
Humidity max 98%, non-condensing (EN 60068-2-30:1999)
Environmental classification, installation mechanical M1, electromagnetic E2; indoor or cabinet use only, with terminal cover fitted; DIN rail TH 35-7.5 (IEC 60715)
Dimensions (L × W × H), material, weight 115 × 103 × 64 mm; flame-retardant polycarbonate housing; DCM6-650: 0.55 kg; DCM6-200: 0.47 kg
Current and voltage connection current terminals with M10 screws on the copper shunt, tightening torque 20–25 Nm; voltage wire AWG 16–20
Conformity Directive 2014/32/EU (MID) and German measurement law (MessEG, MessEV) for both models, per the EU and Eichrecht declarations of conformity in the user manual, for meters labeled accordingly; modules B and D: NMi Certin B.V.
Standards EN 50470-4:2023, IEC 62053-41:2021, IEC 62052-11:2020, EN IEC 62052-11/A11:2022, VDE-AR-E 2418-3-100, PTB-A 20.1, PTB-A 50.7, OCMF 1.2.0; the declarations of conformity also list IEC 62052-31, IEC 62059-32-1, WELMEC 7.2:2022, PTB-8.51-MB10-Krypto-EN-V17

Source: Eastron DCM6 series user manual, 2026 V2.5 (August 2026, with declarations of conformity); weight per model from the DCM6 series datasheet (October 2024). Specifications are subject to change by the manufacturer.

How to choose

Charge point current: DCM6-650 or DCM6-200

The maximum DC current of the charge point decides the model: the DCM6-650 measures up to 650 A and the DCM6-200 up to 200 A. The DCM6-200 has a lower starting current (0.08 A) and minimum current (1 A), which suits lower-current charge points.

Line loss compensation

Alongside mains energy, the meter registers device energy excluding line loss and the line loss energy itself, in 2-wire or 4-wire mode. The line resistance (0–99.99 mΩ) can only be set in assembly mode, and every change is logged.

Billing-grade metering

For the DCM6-650 and DCM6-200, the user manual includes an EU declaration of conformity (Directive 2014/32/EU, MID) and a declaration of conformity with German measurement law (Eichrecht); both apply to meters labeled accordingly. When ordering, state the country where charging will be billed. The accuracy class is B (EN 50470-4:2023). The signed OCMF 1.2.0 data can be verified with the S.A.F.E. transparency software, and the meter public key and Server ID must be displayed visibly on the outside of each charge point. The meter does not support time-based tariffing.

Integration with the charging controller

COM1 (RJ12-1 and terminals 7–8) connects to the charging station controller and COM2 (RJ12-2) to the DCM-D external display, at 4800–115,200 bps. The auxiliary supply is 9–40 V DC.

Installation environment

The DCM6 is for indoor or cabinet installation only, with the terminal cover fitted; it operates from −40 to +80 °C and measures 115 × 103 × 64 mm. The current terminals connect to the copper shunt with M10 screws at 20–25 Nm.

Related services and products

Energom Electronic Kft. is an official distributor of Eastron. Services across the Central and Eastern European region; product delivery across Europe. For Eastron DCM6 meters, Energom selects the model for the charge point current, handles installation and commissioning, and connects the metering data to the charging controller and your monitoring system.

FAQ

Is the Eastron DCM6 MID and Eichrecht certified?

The Eastron DCM6 is MID and Eichrecht compliant in the correspondingly labeled version. The EU and Eichrecht declarations of conformity in the user manual cover the DCM6-650 and DCM6-200 for Directive 2014/32/EU (MID) and German measurement law (MessEG, MessEV); the accuracy class is B (EN 50470-4:2023).

What does the DCM6 line loss calculation do?

Alongside mains energy, the DCM6 separately registers device energy excluding line loss and the line loss energy, in 2-wire or 4-wire mode. Line resistance can be set from 0 to 99.99 mΩ, in assembly mode only.

How can the DCM6 signed measurement data be verified?

The Eastron DCM6 produces OCMF 1.2.0 datasets signed with ECDSA-secp256r1-SHA256, which can be verified with the S.A.F.E. transparency software. The public key and Server ID must be displayed visibly on the outside of each charge point; the public key can also be shown on the display as a QR code.

Does the Eastron DCM6 support time-based tariffing?

The DCM6 does not support time-based tariffing; the timestamp is provided by the charging station controller.

Can the DCM6 energy meter be installed outdoors?

The Eastron DCM6 cannot be installed outdoors as a free-standing device. The DCM6 is for indoor use or installation inside a cabinet, such as the charging station enclosure, with the terminal cover fitted; it operates from −40 to +80 °C.

Request a quote

For your quote, please include the number of charge points, the maximum DC charging current and voltage, the communication needs of the charging controller, and the country where charging will be billed.

Request a Quote

We respond within 24 hours on business days.

Request a Callback