Industrial Energy Management — Metering, Storage, Optimization
Rising electricity prices, contracted-capacity overrun charges and ESG expectations pull industrial decision-makers in two directions: cost reduction and system supervision. With 25+ years of power supply experience, Energom Electronic Kft. builds the full chain — from submeter to C&I energy storage to hybrid solar integration — with one partner.
Typical challenges and how we approach them
Industrial energy management is not one product — it addresses three often-interconnected problems. The situations below recur among our industrial customers.
1. „We don't know where the energy goes" — submetering and monitoring
Challenge: A single meter at the main distribution panel — the monthly bill shows a number, but we don't know how much each production line, shift or HVAC unit consumes. Optimization requires data. „Reduce energy cost" is the management ask, but without decision support, the engineering manager can only guess.
Solution: We design and install a submeter network — energy meters and current transformers (CT) at the main load nodes (production line, HVAC, lighting, auxiliary). The energy management software (EMS) shows the consumption profile, peak loads and anomalies in real time. The management dashboard delivers cost-center-level breakdown — which is what first makes the kWh/product efficiency of production measurable. This metering data can also provide the data basis for an ISO 50001 energy management system.
2. „We pay capacity overrun charges" — energy storage for peak shaving
Challenge: Electricity supply contracts include a significant peak-demand charge — if monthly 15-minute peak consumption exceeds the contracted capacity, the overrun can incur significant extra charges. Production peaks are time-bounded (pump start-up, simultaneous compressor operation, welding line). The remedy is either process re-scheduling (expensive, not always feasible) or „shaving" the peak with storage.
Solution: Install C&I energy storage (BESS) for peak shaving. The storage discharges during peak load (15-minute windows) and recharges during low-consumption periods. Savings come from lower peak-demand charges combined with tariff arbitrage (charge in low-tariff periods, discharge during peak). The EMS makes decisions automatically — the engineering manager sees the reports without manual switching. The payback period is project-specific; we calculate it from 15-minute interval data, the tariff and the contracted capacity.
3. „Solar self-consumption optimization" — hybrid integration
Challenge: An industrial site with a 100-500 kWp solar PV system only achieves payback if self-consumption is high. The fed-in power (grid export) is regulated and yields a low specific value. Daytime production peaks often do not coincide with consumption peaks — sustainable returns require smarter management.
Solution: We design a hybrid solar inverter and C&I energy storage combination. Surplus daytime production is stored and used during the evening shift or weekend base load. The self-consumption ratio can rise significantly; the extent depends on the production and consumption profiles and on the storage size. The EMS optimizes: it watches the weather forecast, tariff spread, current production and the next 24 hours' expected consumption — choosing between storage and direct consumption.
Recommended product categories
Industrial energy management combines four hardware areas with one software layer. Each element works on its own, but designed together they deliver full optimization.
Energy meters and current transformers — Submetering, real-time load monitoring. Modbus, M-Bus, Ethernet communication.
Energy management systems (EMS) — Site-wide consumption monitoring, optimization algorithms.
C&I energy storage (BESS) — Peak shaving, tariff arbitrage, solar self-consumption uplift. From all-in-one systems expandable from 8 kWh to larger industrial storage.
C&I solar inverters — We deploy hybrid inverters that can operate together with battery storage; the storage itself is provided by the battery.
UPS systems — Protection of critical IT and control equipment — alongside energy management, continuity matters too.
Related services
An energy management project is typically a design-installation project lasting several months that operates for years afterwards — let one partner accompany the full lifecycle.
Grid survey and consultancy — On-site survey, consumption profile analysis, payback calculation.
Design and turnkey installation — Submeter network, BESS, solar integration — one design engineer, one installer.
Monitoring and optimization — Continuous report generation, anomaly detection, optimization recommendations.
Maintenance and service — BESS, inverter, EMS maintenance under an SLA contract.
Who we work with
For industrial energy management projects, the key question is: is there enough consumption profile to make the investment pay back? In the segments below, it typically is.
Manufacturing plants (medium-large) — High peak load (compressor, welding line, CNC, press), submetering for cost-center control.
Logistics centers — Cold storage sites, automated warehouse systems (WMS), high-bay control. Peak load smoothing.
Data centers — PUE optimization, monitoring-level visibility into cooling and UPS losses.
Class A office buildings (ESG-oriented) — Tenant peak management, ESG reporting, green certification (BREEAM, LEED).
Food processing plants — Continuous high HVAC load; peak shaving can typically be used well.
Municipal / utility buildings — Grant-funded projects, ESG reporting demand.
Hospitality (HoReCa) — Seasonal peak consumption profiles, EV-combined solutions.
Industrial Energy Management — Frequently Asked Questions
The most common engineering and economic questions related to the industrial energy management solution page — for manufacturing sites, commercial facilities, office buildings and complex industrial customers.
What is peak shaving, and how long does it take to pay back?
Peak shaving is an operating strategy that reduces a manufacturing site's or facility's grid power peaks by inserting energy storage (BESS). Depending on the contract, commercial and industrial consumers may also be billed on the contracted capacity and its overrun — reducing this can bring meaningful operating cost savings if the peaks are time-bounded and the storage power (kW) and capacity (kWh) are sized for them.
The payback period is project-specific: it depends on the tariff structure and contracted capacity, the peak demand pattern (predictable vs. irregular), the BESS power and capacity, and on whether the storage also performs other tasks (tariff arbitrage, solar self-consumption uplift). Based on tariff arbitrage alone, payback is typically slower than when peak shaving and solar integration deliver the savings together.
We calculate the payback period from 15-minute interval data, the tariff and the contracted capacity; a reliable calculation preferably needs several months of load data. Request a payback calculation →
How is an EMS structured?
An EMS (Energy Management System) is a software and hardware layer that monitors, analyzes and controls a facility's energy consumption in real time. A modern industrial EMS has four main layers. (1) Measurement layer: current transformers (CT), voltage meters, energy meters (submeters) and status indicators — these collect the data. (2) Data acquisition and communication layer: through Modbus, BACnet, M-Bus or OPC UA, meter and equipment data flows into a central database. (3) Visualization and analysis layer: web-based monitoring interface, reporting engine, anomaly detection, KPI tracking. (4) Control layer: automated control logic for the BESS, EV chargers, HVAC, lighting and possibly solar inverter operation.
Modern EMS platforms (vendor or open systems) can be extended with cloud analytics and machine-learning anomaly detection.
Deployment typically runs in three phases: design → measurement layer installation → software configuration and integration. Energy management systems →
What is a submetering strategy at a manufacturing site, and how are metering points selected?
A submetering strategy means placing additional meters downstream of the main grid connection — at the level of consumer circuits such as production line, manufacturing hall, compressed air compressor, cooling network, HVAC, office area — so that energy consumption becomes visible by consumer group.
The classic submetering hierarchy has four levels: (1) main connection point (existing grid meter), (2) sector-level submeters (production area, building zone), (3) production line / large consumer-level submeters, (4) machine / end-equipment-level meters (only for major consumers). The structured data identifies the least efficient equipment, abnormal consumption patterns (e.g. a compressor starting too early) and investment priorities (e.g. which equipment replacement pays back fastest).
Metering points follow management questions: „what is the kWh per product?", „which shift consumes more?", „is HVAC or production the main peak driver?". The survey identifies the main load nodes; the number of metering points depends on the site size and the required level of detail. Meters are connected to the EMS via Modbus / M-Bus / Ethernet. The submetering system can also provide the data basis for an ISO 50001 energy management system; in that case we document the selection of metering points. Energy meters and current transformers →
When is solar integration worth designing into industrial energy management?
Solar integration is most economical in industrial environments when (1) there is significant daytime consumption (a 1-2 shift manufacturing schedule shows higher daytime than nighttime load), (2) roof or ground-mount installation space is available, (3) grid connection or energy costs are significant, and (4) the self-consumption ratio is high (generated energy can be used on site, not just exported).
An industrial solar project is typically built on a hybrid solar inverter (e.g. Solis, Hoymiles), optionally combined with C&I energy storage (BESS). The BESS makes it possible to use the midday surplus during evening operations, or to deploy it for peak shaving; how much the self-consumption ratio improves depends on the production and consumption profiles and on the storage size.
The payback period is project-specific: we calculate it from the system proportions, the tariff structure and the grid feed-in settlement. Request a payback calculation →
Can energy storage be added to our existing solar PV system retroactively?
Yes, but compatibility is the key question. If the existing inverter is a hybrid inverter (with a battery connection), a DC-coupled storage retrofit is possible. If it is a grid-only (string) inverter, AC-coupled storage must be designed — a separate inverter + battery + EMS. AC coupling is more expensive but can be fitted to most existing systems. The survey gives sizing and topology recommendations based on the existing inverter parameters. C&I energy storage →
What does a dynamic tariff mean, and can it be used?
A dynamic tariff is electricity priced hour by hour or in 15-minute intervals. If the supply contract allows such pricing, a storage-equipped site with an EMS can automatically charge in cheaper periods and discharge in more expensive ones. The additional savings depend on price volatility, storage size and the consumption profile, while dynamic pricing also carries price risk — so choosing the contract type is a business decision. Monitoring and optimization →
What does ISO 50001 mean in industrial energy management?
ISO 50001 is the international standard for energy management systems (in the sense of a management system), providing a structured framework for planning, implementing, monitoring and continuously improving an organization's energy management. The standard follows a PDCA cycle: planning (energy policy, baselines, targets), implementation (measurement, training, documentation), checking (audits, KPI tracking), action (corrective measures).
The standard describes an organizational management system, not a specific software product: energy management software (EMS) and submetering are tools that support measurement and demonstrating energy performance. Benefits can include consumption reductions from operational optimization (abnormal consumption, idle-mode identification, control fine-tuning), a negotiating position built on audited consumption data, and ESG and some grant-related advantages; the extent varies by organization.
Energom contributes to building the metering and EMS foundations needed for ISO 50001; implementing the management system and certification are the responsibility of the organization and the certification body. Monitoring and optimization →
How does the EMS connect to existing SCADA / BMS, and how do they differ?
SCADA (Supervisory Control and Data Acquisition) is a process-level supervisory system — real-time monitoring and control of production and technology processes. A BMS (Building Management System) supervises building services. The EMS is energy-specific: consumption data collection, energy cost analysis, optimization algorithms (peak shaving, solar integration). The systems run alongside each other.
Integration uses standard communication protocols — most commonly Modbus TCP, BACnet/IP, OPC UA, or IEC 61850 (in substation environments). The EMS reads data from the SCADA as a data consumer (machine status, production volume, load by consumer group) and builds the relevant correlations (e.g. „kWh per unit produced for machine X" KPI).
Two integration patterns are typical. Read-only integration: the EMS only receives data, with reporting focus — low implementation risk. Active control integration: the EMS sends signals to the SCADA or BMS (e.g. „switch off the HVAC in hall 3 during peak load") for automated peak shaving and energy cost optimization — with higher implementation and operational responsibility.
Integration starts in the design phase with a defined data exchange list and responsibility matrix. Design and installation →
How does industrial energy management integrate with EV charging infrastructure?
A unified EMS can handle EV charging, energy storage, solar PV and general consumption together. Dynamic load management (DLM / load balancing) ensures that no subsystem exceeds the site's power limit — for example, when a production peak hits, EV charging temporarily pauses or steps down to lower power. This is particularly important at logistics centers and factories with on-site fleet charging. EV charging infrastructure →
More Questions?
If your problem is different
Industrial energy management is an umbrella topic — often it leads on to more specific solutions. The areas below offer deeper answers to specific sub-questions.
EV Charging Infrastructure — If the energy management focus is fleet electrification.
Uninterruptible Power Supply — If the main risk is IT and critical load continuity.
Backup Power — If you also need to bridge longer outages with generators.
DC Power Systems — If your site also has industrial DC supply needs.
Let's optimize your energy system together
Our engineers deliver recommendations based on an on-site survey and consumption data analysis — submetering, BESS sizing, solar integration, EMS selection. The first consultation is non-binding.
Request a Quote for Your Energy Management Project
We respond within 24 hours on business days. +36 1 459 8010 energom@energom.hu